Battery Storage Facility

Advancing Peak Shaving and Storage Opportunities
Through a Variety of Facilities and Capabilities

Battery Storage2019-01-24T11:15:25+00:00

Battery Storage

 

Facilities and Equipment

  • 1MW/1MWh Battery
    • DOE provided the funds to deploy a 1MW/1MWh battery to be used in coordination with the wind turbines at the site.
    • The battery works in concert with the load, wind turbines, and can be connected to any future development.
  • Primary test bed located at Reese Technology Center.

 


 

Team Leaders

 


 

Experience

The team performed long term testing on the performance of the 1MW/1MWh battery system which included the following types of test:

  • Ramp Rate Control
  • Demand Shaving
  • Frequency Response
  • As well as combinations of the above

 


 

Project Brief

Battery White Paper